Data Quality Rules and Monitoring

A rule that fires and goes nowhere is a report. We build the route, the owner and the record that make a rule change something.

Data quality built as an operating loop rather than a dashboard: rules tied to defects that matter, a named route for each one, agreed tolerances, and a record that shows which rules earn their keep.

Starts with
One defect that reached a customer
You get
Rules with a route and an owner
You own
The tolerance you accept
We bring
The rules and the read-out
Best fit
Finance closes, reconciliations and order flows where a defect is discovered late and by somebody outside the team.
Not a fit
Organisations wanting a data quality score. A score moves; a defect count with an owner closes.

When the defect is found by the customer

  • The reconciliation breaks at month end and the cause is an exception nobody was watching.
  • Alerts exist and are muted, because most of them fire every night and none of them has an owner.
  • The same defect is fixed four times in a year, each time by a different person.

Why this is harder than it looks

Tooling makes rules cheap to write and says nothing about who is woken at 2am, which is the part that determines value.

An alert without an agreed tolerance is muted within a month, and the muting is rational behaviour rather than negligence.

Fixing the same defect four times a year is a design problem that a defect count makes visible and a quality score hides.

A rule is a promise about what happens next

Quality tooling makes it easy to write rules and hard to answer the question that matters: when this fires at 2am, who is woken and what are they expected to do before morning?

So each rule needs three things beyond its expression: a route to a person who can act, a tolerance agreed in advance, and a record of what happened. Without the route it is a report; without the tolerance it fires until it is muted.

A data quality rule and the four stages it needs to actually close a defectA quality rule is a promise about what you will do when it firesRULE: no order may close without a settled payment referenceFIRESOrder 4417 closeswith no referenceROUTESGoes to the owner ofpayment referencesFIXESReconciled or writtenoff within one dayRECORDSVolume, cause andtime to clearTHE PART THAT DECIDES WHETHER IT WORKSA rule with no route is a report. A route with no owner is a queue. An owner with no record is a person people avoid.Most quality programmes build step one and announce success, which is why the same defect returns in the next close.

The four stages a rule needs. Most programmes build the first and call it monitoring.

The record is what makes the programme cheap after the first year. Volume, cause and time to clear tell you which rule is earning its keep, and which one is describing a process nobody intends to change.

What you take away

Rules
Few, and tied to money or trust
Each one traceable to a defect someone actually felt.
Routes
A person per rule
Who is woken, and what they are expected to do before 9am.
Tolerances
Agreed, not discovered
How many a week is normal, and what triggers an escalation.
Record
Volume, cause, time to clear
The evidence that decides which rules to keep.

Who does what

You
Set the tolerance and staff the route. A rule whose owner is a shared inbox is not owned.
We
Write the rules against the defects that matter, wire the routes, and produce the monthly read-out.
The exception owner
Clears or escalates within the agreed time, and feeds the cause back into the design.

What we need to start

  • One defect that reached a customer or a finance figure, and how it was found.
  • The current alert list, including the ones people have filtered out.
  • The person who would be woken, so the route is agreed rather than announced.

How it usually runs

Stage 1
Start from a defect
Trace one that reached a customer or a closing figure.
Rules with a reason to exist.
Stage 2
Wire the route
Owner, tolerance, escalation and expected action before morning.
A rule that can actually close something.
Stage 3
Review quarterly
Volume, cause, time to clear; retire what does not earn its keep.
A shrinking rule set.

Questions we get asked

How many rules should we have?

Fewer than you think. Twenty rules with owners beat two hundred with none, and a shrinking set is a sign the causes are being fixed.

Do we need a data quality tool?

Only after the routes exist. A tool before the routes produces a larger report rather than a smaller defect count.

What is a reasonable tolerance?

One you can staff. If a rule fires fifty times a week and nobody clears them, the tolerance is not fifty, it is a design change.

Where this has been applied

Reading that goes with this

How to start

Show us the last defect that escaped. We will build the first three rules from that, not from a template library. Get in touch.

CONTACT US

We provide a custom made service for just drop us a line.
We would be glad to have feedback from you.