Automating Month-End Close from Nine Days to Two

A finance team closed the month with eleven spreadsheets and a weekend. The work was to make the close a scheduled job with a failure alarm, rather than a heroic act repeated twelve times a year.

Client withheld under NDA. The sector, the shape of the engagement and the constraints are described; no client data, screens, names or volumes are reproduced.

Snapshot
Client
Services group, Hong Kong
Sector
Professional services
Engagement
Close process design, pipeline build, controls, parallel run
Scope
Extract · validation · posting · reconciliation · sign-off · exception queue
Duration
13 weeks, including two parallel closes
Status
Close at two days; eleven spreadsheets retired
9
working days to close, before.
2
after, with the same team and no additional headcount.
11
spreadsheets retired, each with an owner who was glad to see it go.
1
schedule, one alarm, and a named person on the rota.

Problem

The close was not slow because the accounting was hard. It was slow because the same extract was taken five times, by five people, from four systems, and reconciled by eye. Every month the work was redone from memory rather than from a process.

Month-end also concentrates risk. Eleven spreadsheets held eleven sets of logic that only their author understood, and the knowledge walked out of the door with anyone who left — which, in the year before the project, had happened twice.

Figure 1 — The close as a pipeline, with a stop rather than a scramble

walk orderExtractone job, nightlysame query every time1Validaterules firststop on a broken total2Poststaged, then postedreversible until sign-off3Reconcilematched, not eyeballedexceptions queued4Signone person, one timewith the evidence attachedValidation runs before posting. A close that discovers a broken total at the reconciliation stage has already spent the weekend.

Approach

We rebuilt the close as a five-step pipeline with a hard boundary at validation: if a feed is late, short or duplicated, the job stops and pages someone, rather than flowing into a spreadsheet where the error becomes a variance someone explains.

Posting was made two-phase so a sign-off is a release rather than an act of faith. Everything is staged, reviewed, then posted in one transaction, which turned a control that existed on paper into a control that exists in the system.

Figure 2 — Five days, and where the work actually sits

weeks, delivery order024Extract and validatenightly, automatic, alarms1.0wStaging reviewfinance reviews, does not re-key1.0wReconcile and clearexception queue only1.5wPost and signtwo-phase, one transaction1.0wReport and filegenerated, not assembled1.0wThe two days saved came from the last two steps, not the first: reporting used to be an assembly job that started aftersign-off.

What we refused to automate

The judgement. A reconciliation that does not match goes to a queue with a person’s name on it, and the pipeline will not guess, net off or force a balance. Automating the exception would have made the close faster and the ledger wrong.

We also kept one manual step on purpose: the final sign-off is a human clicking a button after reading the exceptions. It takes ninety seconds and it is the only reason the pack can be defended a year later.

What we delivered

Pipeline
Five steps, one schedule
Extract, validate, stage, post, report, on a fixed calendar with one owner.
Validation
Stop before the damage
Row counts, totals and duplicates checked before anything posts; a failure pages a person.
Posting
Two-phase
Staged and reversible until sign-off, then a single transaction with an audit entry.
Reconciliation
Matched, not explained
Automatic matching with an exception queue sorted by age and value.
Reporting
Generated, not assembled
The pack builds from the posted ledger; nobody copies a table into a slide.
Rota
A named person, every month
The close has an owner on a rota, with a runbook and a handover note.

What it changed

Nine days became two, with the same team. The days did not go into more reporting; they went into the analysis the team had never had time for, which is what a finance function is supposed to be doing in the second week of the month.

The risk reduction is harder to see and larger: the logic that used to live in eleven spreadsheets now lives in a versioned pipeline with tests, and it no longer leaves when a person does.

CONTACT US