Quantifying Technical Debt So It Can Be Prioritised

“We have a lot of tech debt” loses every budget conversation. A debt register with a cost per item wins them, because it turns an opinion into a line in the plan.

Method, template and tooling. The scope, the artefacts and the operating rules are described for reuse across engagements.

Snapshot
Client
Multiple Sectors
Sector
IT Consulting and Auditing Services
Engagement
Method, template and tooling
Scope
Debt register · cost model · scoring bands · quarterly review
Duration
Maintained quarterly
Status
In use on every engagement of this type
4
cost dimensions per item: change drag, failure, risk, attrition.
1
number per item, in days per quarter, so it competes with features.
12
items maximum in the register at any time.
0
items justified by code aesthetics alone.

The failure it prevents

Technical debt is real, unfalsifiable and therefore unfundable. Everybody agrees it exists; nobody can say which item buys back the most time, so the work happens in the gaps or not at all, and the same components are patched for years.

The alternative is not a perfect estimate. It is a consistent one: the same four dimensions, scored the same way, expressed in the unit the business already uses — days of engineering per quarter.

Figure 1 — Four costs, one unit

stack, top to bottomChange dragextra days per featurereworktestingcoordinationFailureincidents per quarterfrequencydurationblast radiusRiskexposure if it breaksdatacompliancerevenue pathAttritionwho refuses to work on ithiringhandoveron-callTotaldays per quarterrankcost to fixpaybackOnly the first two are counted in days directly. Risk and attrition are converted using stated assumptions that arewritten next to the number, so a challenged estimate can be argued with rather than dismissed.

How items enter and leave

The register holds twelve items. A thirteenth displaces the weakest, which forces a comparison rather than a growing list nobody reads. Items enter from incidents, from delivery estimates that were wrong for structural reasons, and from the people doing the work — but only with a number attached.

Payback is the ranking. Cost to fix divided by days saved per quarter gives a number of quarters, and anything beyond eight is deferred by default. That single rule removes most of the argument, because a rewrite rarely survives it and a two-week fix usually does.

Figure 2 — Scoring bands, so two people score the same item the same way

Low (1)Medium (3)High (9)Change dragFailureRiskAttritionunder 1 day1 to 3 daysover 3 daysnone this yearmonthlyweekly or worseinternal onlyregulated datarevenue pathno effectslows hiringpeople leaveBands are multiplicative, not additive: one high score outweighs three lows, which matches how debt actually behaves.

What the register is not

It is not a code quality report. Linting, duplication and coverage live in the pipeline where they belong; the register only holds items with a cost the business can feel.

It is also not permanent. An item that has been deferred three quarters running is either mis-scored or not actually painful, and both are worth knowing. We re-score quarterly and delete without ceremony.

What we delivered

Register
Twelve items, no more
A thirteenth displaces the weakest, so the list stays a comparison.
Unit
Days per quarter
The same unit as feature work, so debt competes in the plan rather than beside it.
Bands
Multiplicative scores
Four dimensions, three bands, written down so two people score alike.
Payback
Cost to fix over saving
In quarters. Anything beyond eight is deferred by default.
Sources
Incidents and estimates
Where items come from, so the register is fed by evidence rather than taste.
Review
Quarterly, with deletion
Re-scored, and items deferred three times are removed rather than carried.

What it changed

Debt becomes a line in the plan with a number attached. Two quarters in, the funded items are the ones with payback under a year, and the argument moves to which of those first.

The multiplicative scoring matters more than the precision. It stops a long list of small annoyances from outranking the one item that causes incidents.

CONTACT US

We provide a custom made service for just drop us a line.
We would be glad to have feedback from you.