Data Migration

A migration is not done when the new system opens; it is done when the old one closes. We count, reconcile and prove the move before anyone is asked to trust it.

Moving records from one application to another. It covers profiling, field mapping, trial runs against full-size copies, reconciliation, and the point at which the source becomes read-only — which is the only real measure of whether the move happened.

Starts with
Counts and exceptions
You get
A reconciled move
You own
Sign-off on gaps
We bring
Mapping, tooling, checks
Best fit
A move between systems where old records and old access rules both have to be retired.
Not a fit
A one-off spreadsheet cleanup with no cutover and no reconciliation.

When the old system is still the source of truth

  • Two systems will hold the same record during a transition.
  • A previous migration left unmatched rows nobody could explain.
  • Business users are being asked to check everything by hand.

Why this is harder than it looks

A migration is finished when the old system is read-only, and that moment is a business decision rather than a technical one. Until it happens, both systems are live and somebody reconciles them by hand.

The records are usually the hard part: duplicates with two histories, fields that meant something else in 2014, attachments nobody has opened in years.

So the plan is built backwards from the switch-off, with reconciliation counted as work rather than as contingency.

The records or the engine

Figure 1 — Data migration or database migration, and which one you are actually buying

Data migration or database migration, and which one you are actually buyingWhich problem are you solving?DATA MIGRATIONBusiness records across systemsThe record, its meaning and its owner have to move.THE PROBLEMTwo systems disagree about the same record.THE MOVEProfile, map, reconcile, then switch off the old source.DONE WHENThe business signs meaning and exceptions, not row counts.DATABASE MIGRATIONEngine, schema and accessThe database itself has to change without losing access.THE PROBLEMSchema, permissions or performance do not survive the move.THE MOVERehearse at full volume and explain every difference.DONE WHENCutover has a written reversal and a tested window.If both are true, sequence them. Do not run the record move and the engine move as one cutover.

If the engine is the problem, see Database Migration.

Figure 2 — From a profile to a system that can be switched off

walk orderProfilewhat is really therecounts, quality1Mapfield by fieldrules, defaults2Rehearsedry run on a copyfull volume3Reconcileexceptions explainedcounts, samples4Switchcut and stop the oldreversal, dateA mismatch with no explanation is a stop condition, not a note for later. That rule is written into the runbook before the firstrehearsal.

What you get

Profile
A data profile
What is really in the source, including quality problems nobody had measured.
Mapping
A field mapping
Rules and defaults for every field, with the decisions written down.
Rehearsal
Rehearsal results
Full-volume runs, timed, on a copy rather than on live data.
Exceptions
An exception register
What did not match, why, and who accepted it.
Reconciliation
A reconciliation report
Counts and sampled records that prove the move.
Cutover
A cutover and reversal runbook
Step, check, expected result and undo, plus the date the old system stops.

Who holds each stage

Business signs off what a record means, delivery owns the rehearsal and reconciliation, and engineering owns the tooling.

Figure 3 — Who signs off each difference

BusinessDeliveryEngineeringProfileMapRehearseReconcileSwitchknows the dataruns profilingqueriesapproves meaningwrites mappingadvisesreviews volumeruns rehearsalexecutessigns exceptionschecks samplesautomatesapproves cutruns runbooksupportsBusiness sign-off is on meaning and exceptions, not on row counts alone.

What we need from you

  • Read access to both systems and a copy of the data to rehearse against.
  • Someone who can declare a record obsolete.

How it usually runs

Stage 1
Profile the records
We count what is actually there — duplicates, orphans, empty required fields — before anybody promises a date.
You decide: what may be discarded rather than migrated.
Stage 2
Rehearse on a full copy
Two complete runs against a real-size copy, timed, with the business checking the output rather than the log.
You decide: the acceptance sample, and who signs it.
Stage 3
Switch off
The old system goes read-only on a named date and the reconciliation queue is staffed until it is empty.
You decide: who is on the queue, and for how long.

Questions we get asked

Can we migrate incrementally?

Yes, and it is often safer — but only if both systems can be written to and the merge rule for conflicting edits is decided in advance.

How long will it take?

The profile tells you. Any date given before the record count is a wish with a Gantt bar attached.

What about the history?

Decide how many years stay queryable. Migrating everything is a default, not a requirement, and it is often the largest single cost.

Where this has been applied

Reading that goes with this

How to start

Bring the largest table nobody trusts and the last spreadsheet used to check it. Get in touch.